Regional Saugus River Floodgate ProjectThis Regional Saugus River Floodgate Project was planned and designed over eight (8) years (1985-1993) by the Army Corps of Engineers with the help of Citizen Steering Committees from Lynn, Malden, Revere & Saugus and a Technical Group of environmental and other interests to reduce coastal flood damages as a result of the catastrophe in the Blizzard of ‘78 and subsequent storms.  This nor'easter flooded 3,100 buildings affecting 10,000 residents, 20,000 employees and 400,000 commuters. A total of 4,000 people were evacuated over two days of severe flooding up to 7 feet deep in freezing weather with recurring damages estimated at $288 million. The Regional Project, which includes a floodgate structure with 9 gated openings at the mouth of the Saugus River tied into 3.1 miles of shorefront structures and acquisition of 1,650 acres of Estuary storage area, provides the highest level of coastal flood protection and against sea level rise from storms far worse than 1978 benefiting 5,000 buildings, 8,000 housing units… includes significant environmental, social and economic benefits.

Current Status

The Project was sponsored by Lynn, Malden, Revere & Saugus, and in 1990 by the State's Metropolitan District Commission (MDC).  In 1993 a new Secretary of Environmental Affairs was opposed to construction along the Massachusetts coast and refused to support the Project.   The Metropolitan District Commission (MDC), the state sponsor, letter that followed stated there would be a delay pending the state’s reevaluation of non-structural solutions, yet to be accomplished.

 The Project was stopped after completion of the Feasibility Report, EIS/EIR and completion of physical and numerical modeling which helped design the most effective features to protect the region…also stopped after Congress authorized it for construction and the state had sponsored it. 

Future Action

With the Governor’s current support for protecting coastal communities against sea level rise, the time may be right to reconsider the project.  Only the support and action of the 4 communities can resume the state and Federal action to build the project.

Slide6 Rescue BoatBlizzard of '78 Flooding - Up to 7 feet of water damaged 3,100 buildings & flooded transportation routes for 400,000 commuters in the region, 4,000 people evacuated.

Report Title Pages

Show Your Support

Please contact your community representatives with letters and emails of support or concerns.